- Home
 - Projects
 
Switch renewal Muskauer Straße
Due to significant signs of wear, Cottbusverkehr GmbH planned the renewal of points 305 and 306 in the Sandow district of Cottbus over a length of 52 metres.
 Turnout 305 was completely renewed. At turnout W305, the double-track section of track located on a special railway structure next to Muskauer Straße was merged into a single-track section of track.
                
              Disciplines
- Railways
 
Companies
GRE German Rail Engineering GmbH
Client
Cottbusverkehr GmbH
Duration
From 2018 to 2020
Location
Cottbus (Brandenburg) , Germany
Construction Sum
approx. € 0.560 million
Project Activities
Project planning traffic facilities according to § 47 HOAI 2013 Lph 3-8
 Specialist planning of technical equipment according to § 55 HOAI 2013 Lph 3-8
Special services:
 Local construction supervision
Subcontractor services:
 Subsoil
 Electrical engineering
 Catenary systems
Technical parameters:
Renewal of the points
 Electrical engineering
 Catenary systems
Project Images